ARINC REPORT 668 PDF

0

ARINC REPORT ()_信息与通信_工程科技_专业资料。GUIDANCE FOR TOOL AND TEST EQUIPMENT (TTE) EQUIVALENCY. ARINC provides guidelines for the process used to establish the equivalency of TTE and related procedures other than that recommended. Buy ARINC Guidance For Tool And Test Equipment (Tte) Equivalency from SAI Global.

Author: Vudorr Zulkikus
Country: Maldives
Language: English (Spanish)
Genre: Relationship
Published (Last): 11 July 2008
Pages: 438
PDF File Size: 5.37 Mb
ePub File Size: 8.41 Mb
ISBN: 478-5-61389-667-4
Downloads: 38662
Price: Free* [*Free Regsitration Required]
Uploader: Kigagrel

ARINC REPORT ()_图文_百度文库

Modify dash 7 base by machining slot 11 x 0. Proposals that are not accepted may be classified as follows: Attachment 2 provides a checklist to assist in evaluating equivalency program and process attributes.

As noted in Figure 1, this is a tool selection process. Freee book download Belinda Bennett. It was established that two separate basic equivalency processes exist: We provide copy of arms limitation and disarmament restraints on war in digital format, so the resources that you find are reliable.

No change to the task was necessary. Let uslook at a arimc of these benefits. The tooling is used with care and not subject to general workshop wear and tear. The group determined that the only way a global substitution can be authorized is if each and every application of the original arunc was analyzed, and a determination made that the alternate tool would meet the requirements of each application.

ARINC REPORT 668 EPUB

It is strongly suggested that for each Category 4 TTE condition, a specific plan be developed defining the available data, what processes will be reort to develop the supplementary data, and how that data will be utilized to substantiate the declaration of equivalency. Evaluation criteria will include: In general, functional equivalency constitutes a task implementation that results in the same or better results using alternative equipment as when using equipment recommended by the OEM.

  1995 CHEVY BLAZER OWNERS MANUAL PDF

Arinnc such, they are responsible to ensure that any organization performing maintenance on that aircraft, engine, or component parts follows the processes and procedures qrinc in their continued airworthiness program as approved by their local regulatory agency.

Charter Flights And Wi-Fi: In order to facilitate the continuous product improvement of this ARINC Standard, two items are included in the back of this volume: Derived Task and Tool Requirements Section 4.

ARINC REPORT EPUB

Slat Actuator Rev. Calibration data and a green page amendment giving instructions for the use of the ANZES tool will also be approved by this assessment. The equivalency determination has to be performed for each element used for the task at hand.

Meetings The following table identifies the number of meetings and proposed meeting days needed to produce the documents described above. And all data and procedures have to be consistent with software configuration management procedures on the aircraft workshop level.

It covers the technical support and data packages TSDPs that avionics original equipment manufacturers OEMs should supply to third-party test program set TPS providers as the prerequisite for high-quality test solutions. Other organizations, such as airframe manufacturers, avionics vendors, etc.

Describe how the new standard will improve competition among vendors, giving airlines freedom of choice. Reason for Correction State why the correction is necessary. Specifications Measurement Distance 6668 actuator mount centreline and fixed distance block.

  IEEE STD 1076.1-1999 PDF

The title also will change to reflect a wider scope: How derived requirements are documented?

In the case where such maintenance documentation does not fully define the requirements for the original task and TTE, the airframe or engine manufacturers should ensure that any other needed information is provided.

BMH 53 ARINC groups take a fresh look at standards about every five years, and in the working group published an update known as This information should be sufficient to allow operators to select alternative equipment. The form and format of the documentation in a CMM is not standardized nor is the means for verifying the quality of the data therein.

Therefore, this document was written to address the equivalency based on a specific task, a group of tasks, rreport, or group of applications i.

Safe But Not Secure: Proposed modification eliminates need for expensive 12″ dial indicator and uses existing verniers for measurement of actuator rod travel. This section describes the expected roles and responsibilities of each group throughout the equivalency process.

Depending on the category and complexity of the TTE, the data may include but is not limited to the following: A method to identify the alternate TTE?