Celit 4D. Done. Comment. views. 0 faves. 0 comments. Taken on August 20, Some rights reserved. Flickr is almost certainly the best online photo management and sharing application in the world. Show off your favorite photos and videos to the world, securely. Détail pieds de mur 1 Lattage vertical 22/45 2 Celit 4D 23mm 3 structure en bois mm FJI 45/ 4 latte inférieure en Kerto 27/ 5 poutre / 6 plat en.

Author: Mejinn Goltilrajas
Country: Malaysia
Language: English (Spanish)
Genre: Health and Food
Published (Last): 18 April 2018
Pages: 399
PDF File Size: 16.2 Mb
ePub File Size: 19.37 Mb
ISBN: 488-7-63962-552-9
Downloads: 76309
Price: Free* [*Free Regsitration Required]
Uploader: Tauhn

The roofing substructure is composed by an insulation material, a set of wooden vertical profiles and a metallic construction support system where the BIPV roofing shingles are installed. Subsequent corrections are then more difficult to perform than at this point in the installation process.

Wurtz screws are used to attach these aluminum profiles to the wood structure. Door een zeer grote marktvraag naar houtbriketten en -pellets zijn de Ecopower houtbriketten niet meer leverbaar op korte termijn.

A schematic overview of the construction celjt given next:. In this Belgium demo building we demonstrate 4v RS02 solar roof elements.

Menisoss sprl

Nevertheless, the components, materials and their installation process may ceit in different cases, thus the information provided in this document should be handled with care, adjusting the installation with regard to the existing roof composition in each case. Roof details of the demo house in Mons B.

Eurabo cvba gebruikt cookies om uw surfervaring op deze website te verbeteren.

Roof layers The construction is built up in different layers: The construction of the cavity needs enough space at the lower and the upper part of the roof. Also the openings on both sides of the cavity need to be big enough otherwise they will hinder the airflow or even stop it.

  CHRISTOPHER COLUMBUS AND THE AFRIKAN HOLOCAUST PDF

Systeemoplossingen Ontdek vaak voorkomende bouwsystemen met onze systeemoplossingen. A well insulated roof like most roofs since has a risk of internal condensation. Building physics The most important difference between both types are the physic aspects.

Celit 4D | Peter Steen en CO | Flickr

The aim of this guideline is not focused on the installation process of the BIPV modules, but the construction process of the substructure needed to install them. More detailed, the vertical profiles are mounted celot screws over the wooden profiles and the Omega profiles on the roof surface alternately every 70 cm.

The house has a roof and a facade. In this Belgium demo building we demonstrate the RS02 solar roof elements.

This is an h1 heading

Omega profiles that will be placed in between 2 panels in order to collect the rain water that may flow in the vertical space between 2 panels. Heeft u vragen over producten, een project of levering? Screws Wurtz screws are used to attach these aluminum profiles to the wood structure. Some are placed with their original length cm while some other are cut. General principle of the placement of one panel Inserting a panel in the top rail The placement of the EPDM joins Additional T joins are placed to avoid movement by strong wind.

Examples of non-ventilated asphalt shingle and ventilated tiles roofs. In order to avoid any risk of removal of a panel due to the wind, it is proposed to place an additional join T join. The modules are slided in the horizontal profiles and fixed with the use of EPDM joins: This means that the watertight layer has a ventilated cavity under it.

  DESCARGAR DECRETO 2535 PDF

Menisoss sprl Menuiserie, isolation, ossature bois.

The house has a roof and a facade. The omega profiles are manufactured on demand by the local company Facozinc.

Introduction Traditional roofs with tiles are ventilated roofs. Omega profiles The omega profiles are manufactured on demand by the company Facozinc based in Gilly Belgium.

In general an air-cavity of around 50 mm will give an air flow that is enough to ventilate the heat away. Installation of the modules After the framework is installed, we start placing the modules. The figures below show the positions and number of these profiles.

De Steico Joist-ligger met flenzen is geschikt voor cekit, roosteringen en vervanging van betongewelven in metselwerk. De precieze openingsuren van onze twee vestigingen, Eurabo Ronse en Eurabo Gent vindt u hier. Installation of the vertical profiles on the wooden beams Three types of profiles have been used: After the crlit is installed, we start placing the modules.

The basic construction and celti materials for construction are described in guideline b1. The efficiency of PV cells is influenced by the temperature of the cells.